English Languages

Change Language close


Long Term Apartment for rent in Vila Nova de Gaia Portugal EN Location longue durée Vila Nova de Gaia Porto-North Portugal FR vivienda alquiler Vila Nova de Gaia Porto-North Portugal ES Immobilie zum Mieten Vila Nova de Gaia Porto-North Portugal DE affitto lungo termine Vila Nova de Gaia Porto-North Portugal IT Huizen en appartementen te huur Vila Nova de Gaia Porto-North Portugal NL Arrendamentos de longo prazo Vila Nova de Gaia Porto-North Portugal PT долгосрочная аренда Vila Nova de Gaia Porto-North Portugal RU
fav Add to shortlist    Shortlist (0)
« Back to Search

Host Wise - Fervença Boutique Palace 101A

ok Select Dates to check availability

cal
From
£2,628 GBP | $3,525 USD

Type: Apartment
Size: 50 m2
Lease Term: Monthly
Maximum Stay: 12 month(s)
Minimum Stay: 1 month(s)
Bedrooms: Studio
Bathrooms: 1
Furnishings: Furnished
Utilities: Included

ac Air Conditioning
smoke No Smoking
Continue to Reserve
No Payment until Owner Confirms.

Listing by: (Flatio)

close
This property advert is syndicated through Flatio.

For Owners:
If you are the owner of this property, all reservations and emails for this advert will go directly to your flatio account.
This advert is automatically syndicated and updated approximately every 48 hours.
You are not able to edit this advert directly on this website. Please administer any changes/edits using your account with flatio.

email StayProtection for Guests

close
email Covered by StayProtection.

• Move-in Guarantee
Ensuring you'll always have a place to stay, even if everything doesn't go as planned.
• Balanced visa-friendly lease agreement
Providing equal rights and adding great flexibility to your stay.
• 100% money protection
Which guarantees your transactions are always secure and free from scams.

You're automatically covered by our
StayProtection package.

Host Wise - Fervença Boutique Palace 101A

Indulge in a truly extraordinary stay at our luxurious duplex apartment, where opulent design meets modern comfort.
The meticulously curated top-notch decor transports you to a realm of timeless elegance within the confines of a historic palace. Spanning two levels, this residence offers a seamless blend of sophistication and contemporary living.
The enchantment extends beyond the confines of the apartment, as a private small balcony beckons you to unwind amidst its lush greenery.
The space
Indulge in a truly extraordinary stay at our luxurious duplex apartment, where opulent design meets modern comfort. The meticulously curated top-notch decor transports you to a realm of timeless elegance within the confines of a historic palace. Spanning two levels, this residence offers a seamless blend of sophistication and contemporary living.
As you step inside, be captivated by the grandeur of the duplex, adorned with intricate detailing and lavish furnishings. The carefully selected decor reflects a commitment to providing a high-end, immersive experience. Revel in the comfort of air-conditioning, ensuring a pleasant ambiance throughout your stay.
The enchantment extends beyond the confines of the apartment, as a private small balcony beckons you to unwind amidst its lush greenery. The outdoor space, meticulously landscaped, offers a serene oasis where you can relax and escape the hustle and bustle of the city.
The fully equipped kitchen boasts top-of-the-line amenities and utensils, inviting you to channel your inner chef and prepare delightful meals. Every aspect of this duplex, from its luxurious interior to the enchanting small balcony, has been designed to create an unparalleled Airbnb experience. Immerse yourself in the sophistication of our historic palace residence, where each detail is thoughtfully curated to elevate your stay to new heights.
email Translate

close
Notes:
Lease agreement included
All bills included
Deposit for stays over 6 months: 3037.00 (EUR)
No Deposit for stays of less than 6 months!
If you cancel your booking 30 days or more before the move-in date, you`ll get a refund of the entire first rent. If you cancel your booking up to 14 days before the move-in date, you`ll get a refund of half of the first rent. If you cancel your booking less than 13 days before the move-in date, you won`t get a refund of the first rent.
ok First Select Dates to check availability

cal


Contact Owner
email How do I book?
Contact the Landlord to check availability and to ask any questions you may have. Once the host confirms, you can complete your booking.
Additional Rates:

Map / Location
Details:
Address: Rua do Pilar 114
Postcode:
City: Vila Nova de Gaia
Region: Porto-North Portugal
Area: Costa Verde-Green Coast
Country: Portugal
Size: 50.0 m2
Main Features:
Pets:
Payment options:
Smoking: No Smoking
Airconditioning: check
Internet:
Telephone/fax:
Features:
Sofas:
Easy Chairs:
Television: check
Kitchen:
Washing Machine:
Dishwasher:
Fridge: check
Freezer:
Oven: check
Hobb/Cooktop:
Dining Table:
Availability Calendar: booked Booked Available Available
Viewed
22
Related Searches:
Vila Nova de Gaia Apartment for rent | Vila Nova de Gaia Student Apartments | Vila Nova de Gaia Cheap Apartment | Vila Nova de Gaia Corporate Apartment |